常用汽车行业英文缩写及词汇

点击数:6247 发布时间:2008/4/7 17:18:52 发布者:stevezz007


1PP- First Phase of Production Prove-Out 第一次试生产
3C Customer(
顾客导向)Competition(竞争导向)Competence(专长导向)
4S   Sale, Sparepart
零配件, Service, Survey信息反馈
5S
整理,整顿,清理,清洁,素养
8D- 8 Discipline
ABS   Anti-lock Braking System
AIAG  
美国汽车联合会
ANPQP Alliance New Product Quality Procedure
Apportionment
分配
APQP   Advanced Product Quality Plan
Backlite Windshield
后窗玻璃
Benchmark Data
样件资料
bloodshot adj.
充血的, 有血丝的
BMW Bavarian Motor Works
C.P.M Certified Purchasing manger
认证采购经理人制度
CB- Confirmation Build
确认样车制造
CC- Change CutOff
设计变更冻结
CC\SC- critical/significant characteristic
CCR Concern & Countermeasure Request
CCT Cross Company Team
Characteristics Matrix  
特性矩阵图
COD   Cash on Delivery
货到付现 预付货款(T/T in advance)
CP1- Confirmation Prototype 1st
第一次确认样车
CP2- Confirmation Prototype 2nd
第二次确认样车
Cpk
过程能力指数Cpk=Zmin/3
CPO   Complementary Parts Order                        
Craftsmanship
精致工艺
Cross-functional teams
 跨功能小组
CUV Car-Based Ultility Vehicle
D1
:信息收集;8D
D2
:建立8D小组;
D3
:制定临时的围堵行动措施,避免不良品流出;
D4
:定义和证实根本原因,避免再发;
D5
:根据基本原因制定永久措施;
D6
:执行和确认永久措施;
D7
:预防再发,实施永久措施;
D8
:认可团队和个人的贡献。
DCC Design Change Control
DFA- Design For Assembly
面向装配的设计
DOE Design Of Examination
试验设计
DQES Delivery Quality Evaluation System
DTL Direct To Line
DVP&R Design Validate Plan&Report
设计验证计划报告
EDI electronic data interchange
电子数据交换
ERP   Enterprise Resource Planning
ES Engineering Specification
工程规格
ESI Early Supplier Involvement
供应商先期参与
Ex-Work
(工厂交货)、FOB(船上交货)、FAS(船边交货)或CIF(运保费在内交货)
FEU- Field Evaluation Units
用户市场实际体验与评估
first gear
一档
Flow Chart
流程图
FMEA   Failure Mode and Effects Analysis
four-wheel drive
四轮驱动
FRG- Ford Reliability Guideline
福特可靠性指导
Front Windshield
前挡风玻璃
Tempered glass  
钢化玻璃
front-wheel drive
前轮驱动
FSS- Full service supplier
全服务供应商
FTA Fault Tree Analysis
GD&T- Geometric Dimensioning & Tolerancing
标准公差
GR&R Guage Repeatability&reproducibility
量具的重复性和再现性
HTFB- Hard Tooling Functional Build 工装集成调试与验证
IPO Individual Parts Order
ISIR Initial Sample Inspection Report
JIT Just In Time
KD- knocked down/ Semi Knock Down(SKD) /Completely Knock Down(CKD)
KO Kick-off
Laminated glass  
夹层玻璃
LP
Lean Production 精益生产
LR   Launch Readiness
LS Launch Support
LVPM   Local Vendor Packaging Method
MPV Multi-PurposeVehicle
多用途汽车
MRD Material Required Date
MRO Maintenance,Repair,and Operation
MTP- Make to print supplier
照图加工供应商
N/A- Not Applicable
NCDR Non-Conforming Delivery Report
NCMAR Non-Conforming Material Action Report
NDA Non Disclosure Agreement  
保密协定
NDS Nissan Design Specification
NML   Nissan Motor Ltd
NVH- System Noise, Vibration & Harshness
系统噪音,振动及粗糙性
OSM- Outside of Material
PA Program Approval
pallet n.
托盘
Passenger Vehicle  
乘用车
PAT- Program Attributes Team
产品属性小组
PDL   Product Design Letter
PH   Proportions&Hardpoints
PIPC- Percentage of Indexes with Process Capability
能力指数百分比
PIST- Percentage of Inspection points Satisfying Tolerance
检测点满意工差百分比
PMT- Program Moudle Team
产品模块小组
PO Purchase Order
PPAP- Production Part Approval Process
生产件批准程序
PPSR Production Preparation Status Report
PQA Process Quality Assurance
PR   Program Readiness
Pre-Launch
试生产
price-driven costing
价格引导成本
Production Preparation-Final   Nissan - PT2/Renault - PP
Production Preparation-Initial Nissan - PT1/Renault - PPP3
Production Trial Run
试生产
Prototype  
样件
QFD   Quality Funtion Deploy
质量功能展开
QFTT   Quality Functional Task Team
QR- Quality Reject
质量拒收
QS   Quality Standard
RAN   Release Authorisation Number
reverse
倒车档
RFQ   Request For Quotation
询价
RKD   Reverse Knock Down
RLQ   Receiving Lot Quantity
ROC Rate of Climb
ROI return on investment
报酬率
ROP Re-Order Point
RTO   Required To Operate
SAIS   Supplier Assessment & Improvement System
SC Strategic Confirmation/significant Charac'teristics
SDS- System/ Design Specifications
系统/设计说明
second gear
二档
SFMEA System FMEA
Shipping Date
出货日、Invoice Date 发票日或On Board Date   装船日
Side Windshield
侧窗玻璃
SJ Strategic Intent
SNP Standard Number of Parts
SOW- state of work
工作申明
SPC Statistical Process Control
SQA Supplier Quality Assurance
SREA- Supplier Request for Engineering Approval
供应商工程设计更改申请
ST Surface Tranfer
STRS   Supplier Test Report System
Subcontractor
分承包商
Sunroof Windshield
天窗玻璃
SUV   Sports Utility Vehicle
TAG Test Aptitude Graphique
TCO   Total Cost of Ownership
总持有成本
TCRA Total Cost Reduction Activity
TGR Things Gone Right
TGW Things Gone Worst
TM   Techinical Manual
TPM Total Preventive Maintenance
TTO-Tool Try Out
工装验证
UOM Unit Of Measure
VES Vehicle Evaluation System
VO- Vehicle Operation
主机厂
VPP- Vehicle Program Plan
整车项目计划
VQA   Vehicle Quality Assurance
VTTO- Vendor Tool Try-Out
供应商工装验证
WERS- World Wide Engineering Release System
WVTA Whole Vehicle Type Approval
OTS OFF TOOL SAMPLE
用批量生产的工模器具制造出的样件
PVS Produktions Versuchs Serie
批量试生产
TMA Trial Manufacturing Agreement    
2TP
两日试生产,主要是验证供应商的批量供货能力
OS  
零批量,是批量生产前的总演习,批产的全面验证
SOP Standard Operation
即批量生产 Start-Of-Production   Standard Operating Procedure 标准操作程序
QSV Qualitaes-Sicherungs-Vereinbarung
质量保证协议
BMG Bau-Muster-Genehmigung
产品工程样件性能检验认可
Nullserie
零批量
QSR
质量体系要求
Bias
偏差
DB Durability Build
样车阶段
lead time n.
订货至交货的时间
sink mark
缩痕
LRR launch readiness review
YC (Potential Critical Characteristic)
潜在关键特性
YS (Potential Significant Characteristic)
潜在重要特性
Restriction of Hazardous Substances
简称RoHS       SGS, BV, TUV, Intertek, ETC   BV-Bureau Veritas 法国国际检验局

Front bumper 前保险杠
Rear bumper
后保险杠
Radiator grille
格栅
Headlamp
前大灯
Tail lamp-liftgate
尾灯-行李箱盖上
Tail lamp-quarter
尾灯-后侧围上
Front door trim panel
前门内饰板
Rear door trim panel
后门内饰板
Interior release handle bezel
内开手把手框
Power controls bezel
电动车窗开关框
Window interior capping
窗框饰条
Exterior mirror
外后视镜
Body side moulding
防擦条
Cowl grille
通风格栅
Roof molding
车顶装饰条
Lift gate molding
牌照板支架
Lift gate handle
行李箱盖拉手
Weather strip_door openings
门框胶条
Weather strip_liftgate
行李箱胶条
A Pillar Trim A

B Pillar Trim upper B
柱上
B Pillar Trim lower B
柱下
Front scuff Plate
前门槛条
Rear scuff plate
后门槛条
Back panel trim lower
行李箱门槛条
Garnish trim-Quarter window
Cowl trim panel A
柱下
Liftgate upper trim
尾门内饰板上
Liftgate side trim
尾门内饰板中
Liftgate lower trim
尾门内饰板下
IP
Defroster panel
除霜盖板
Console
中控台
Steering column cover
方向机柱上下盖板
Cluster
组合仪表
Carpet
前地毯          
Trunk carpet
后地毯
Front seat
前座椅
2nd row seat
第二排座椅
burr(
金属) flash(塑件)毛边
gap
间隙
defective products
不良品
finished products
成品
disposed products
处理品
band-aid
创可贴
scratch
刮伤
dents
压痕

凹坑 concave
车床 lathe
抽查试验spot check test
出厂试验delivery test
次品defective product
调幅amplitude modulation (AM)
调频 Frequency Modulation
断差 offset
对讲机 interphone
法平面normal plane
翻车rollover
返工 re-doing
防滑地板 no-skid floor
仿真emulation
副作用side effect
改装厂 refitting factory
隔热板heat shield
后围侧板 rear wall side cover
划痕 scratch
假人dummy
间隙 interstice
节点pitch point
结皮现象skinning
扭矩torque
汽车总布置草图sketch for automobile layout
汽车总装配图automobile assembly drawing
汽油供给管gasoline feed pipe
汽油箱gasoline tank( petrol tank)
前围角板 front wall angle cover
轻型客车light bus
曲轴crankshaft
三类底盘 three type chassis
上模upper die
甚高频very high frequency (VHF)
下模bottom die(counter die)
消声器silencer
选料上乘、做工精细be superior in material and excelllent in workmanship
仪表板 dash board
油门throttle
褶皱 crimple
整车运输transportation of truck-load
总装 final assembly
阻流板step,reflectro,baffle
最大扭矩转速speed at maximum torque
左对齐left justify
报废scrapping
皮纹 grain
缩水 Shrinkage  
缩水 Sink Mark  
顶白 Stress Mark  
首检 First article inspection
自检 Self-inspection
全检 100% inspection
巡检 process audit
开箱检验 out of box audit
出货检验 out-going inspection
进货检验 in-coming inspection
例行检验 Routine checking
确认检验 Confirming
全尺寸检验 full dimension inspection
可靠性试验 Reliability test
在线检验 on-line inspection
线下检验 off-line inspection